Road Re-opens After Flood Alleviation Work Completed
Wednesday 24th Apr 2024
A road has re-opened after being closed due to flood alleviation work in St Asaph.
Lower Denbigh Road has re-opened following work to reduce the flood risk to residents living in the Glascoed Road area, which has a history of flooding incidents.
As part of the work the Plas Roe culvert, located between Lower Denbigh Road and the junction with Glascoed Road, has been replaced with a new concrete box culvert.
The Council would like to thank residents for their co-operation during the road closure.
Posted on Monday 2nd December 2019